Many graduates have good grades, but lack the skillset to hit the ground running in an organization. This, perhaps, is the reason why many graduates are unemployed. Do you think Schools should be blamed for this?  What should be done to augment the value of the Nigerian graduate to the industry using Applied Science and Engineering graduates as reference point?
72
None of the above
73
its all of the above
74
What single innovation, in your opinion, will jump-start the development of Nigeria in Engineering and Technology.
75
Corruption, Impatience, Hunger or lack of wisdom: Which of these factors is, in your opinion, the root cause of technological backwardness in Nigeria. Are there other factors that count?
76
Click to View This Week's Quiz / Week 1 & 2: 7 Simple Objective Questions!
« Last post by ffadmin on June 15, 2015, 03:15:24 AM »
1.    The Process Flow Diagram(PFD) will typically include which of the following
A.      Relief Valves
B.      Utility Lines
C.      Maintenance Valves
D.      Control Valves
E.      Spectacle blind



2.    Put the following tasks in correct sequence (First to Last)
A.       HAZOP Study
B.       P&IDs: Issued for HAZOP
C.       P&ID Design Review/workshop
D.       P&IDs: Issued for Construction (IFC)



3.    The design and construction code applied in the Oil & Gas industry for pressure vessels is
A.       API 5L
B.       ASME B31.3
C.       ASME Code Section VIII
D.       API 14C
E.       ASME B31.4



4.    Piping and Instrumentation Diagrams are developed from Equipment Plot Plans. TRUE/FALSE.



5.    The wall thickness of a given line pipe can be completely specified by which of the following?
A.       Pipe Schedule
B.       Pipe Material Density and Minimum Yield Strength
C.       Pipe OD and Weight Class
D.       Pipe ID
E.       Pipe Nominal size and Schedule



6.    Which comes first, Block Flow Diagrams or Process Flow Diagrams?



7.    Which of the following is not a component in a typical Safety Instrumented System/loop:
A.       PRESSURE TRANSMITTER
B.       PRESSURE RELIEF VALVE
C.       PROCESS LOGIC SOLVER
D.       EMERGENCY SHUT-DOWN VALVE (ESD)



Submission deadline expired!